In this project, we designed rainwater drain structure for pre-treatment of non-point source pollution.
This is how I came up with the idea for this project:Considering the availability conditions of the electric absorption technology and the conditions of actual flood, we reached a conclusion that the electric absorption technology was unsuitable. This served as an opportunity to change direction from chemical process to physical process.
Programme manager ania.andersch@siwi.org +46 8 121 360 59